PRODUCT COSTS DEPEND ON THE NUMBER OF JUGS PURCHASED;

Generally, the amount of product required will depend upon the type of soil
encountered and its moisture contends. A roadway one (1) Kilometer long by 6
meters wide will require about 150 liters (8 Jugs) of product where ideal soil
conditions exist and up to 300 liters (17 Jugs) where less than ideal soil
conditions exist. Soil must be tested to determine the correct amount of
product and water ratios to produce the best roadway results.

BUILDING ROADS FASTER / BETTER

7 Road System can build 1 kilometer of road in only 1 day.
Conventional Road building System builds 1-kilometer of road in 1-2 weeks

1.Utilizes existing in-place natural road bed soils

2.NO, importing or transporting of base gravel

3.Remove organic materials & scarify existing soils

4.7 Base Stabilizer mix ratio 1:300 H2O

5.Less equipment and construction time

6.7 System are Optional applied Road Wear Surface

7.Bitumen enhancer, for Asphalt Pavement Icon Super Crete,  for concrete Pavement

Required Equipment:

1Grader

1 Water Tank with Sprayer

1 Compactor – 25 Ton

7 Road system, with full infrastructure facilities will look to employ
90% of the labor force for this project locally. The labor force will consist of
skilled, professional and day laborers per community.